Below: Site prep, view from winery
parking lot looking west. May 2005 |
Below: Barrel cave site is to the
left; storage and production buildings to the right. |
|
 |
 |
|
 |
 |
|
The
concrete work begins! June 2005 |
Concrete
work, June 2005. |
|
 |
 |
|
The view to the north. |
Foundation & stem
walls for tank storage (right) and production, lab and offices,
left. |
|
 |
|
|
Walls going up on the production
building. 6/05 |
Concrete
roof being lowered onto barrel cave. 6/05 |
|
 |
 |
|
view of barrel cave and
production building looking. Late June 2005. |
Completing
concrete work on the roof of the barrel cave, late June 2005. |
|
 |
 |
|
Stainless steel storage tanks arrive,
above, and are lifted into place, next photo. |
|
|
 |

|
|
|
|
|
|
Barrel cave; door opens to new
bottling area. Plans include a landscaped courtyard area in front,
and to the left of the barrel cave. Future plans may include a
garden area on the roof of the barrel cave. The last photo was taken
on July 12, 2005 and shows the building that will house production,
bottling, lab, offices and entry into the barrel cave (front
building) and the building adjacent, right, is the tank and storage
building. |
|
|